Engineering

OFFICE HOURS ARE 7:30 A.M. TO 4:30 p.M. MONDAY - FRIDAY
CONTACT City Engineer BY PHONE AT  715-486-2034 OR E-MAIL

The Engineering Division of the Public Works Department is responsible for planning, budgeting, design and coordination of all public construction and maintenance projects.  These projects would include street openings, traffic control, concrete paving, hot mix surfacing, sanitary sewers, greenways and stormwater ponds. 
Other notable projects under the Engineering Division include erosion control regulation, review and implementation of on-site stormwater management; storm sewers, street maintenance, sidewalks, parking lots, buildings and construction of the wastewater treatment plant.

This division also provides information to the public regarding land / structures, existing sanitary sewer, storm sewer, water mains and their corresponding service laterals, street construction plans, aerial photos and city plats / certified survey maps.

Part of the City's stormwater management plan is to ensure erosion control is being implemented on all construction sites.  One and two family homes can submit an erosion control plan with the building permit which can be found on the left side of this page.  Developments of an acre or larger shall submit a stormwater management plan following Wisconsin DNR technical standards and the City's Municipal Code Chapter 25.  

City infrastructure as of 12/31/202020201009_143752

Area of City: 13.84 sq-mi, 8856 acres
Streets: 144.7 mi
Sanitary Sewer Mains: 137.5 mi
Storm Sewer Mains: 111.42 mi
Water Mains: 144 mi
Street Lights: 2,121
Traffic Signals: 27